{"id":8894,"date":"2020-02-05T09:43:40","date_gmt":"2020-02-05T07:43:40","guid":{"rendered":"https:\/\/miir.gr\/?p=8894"},"modified":"2024-03-20T16:23:48","modified_gmt":"2024-03-20T14:23:48","slug":"how-the-european-rail-traffic-management-system-works-and-why-it-s-not-working","status":"publish","type":"post","link":"https:\/\/miir.gr\/en\/how-the-european-rail-traffic-management-system-works-and-why-it-s-not-working\/","title":{"rendered":"How the European Rail Traffic Management System works (and why it&#8217;s not working)"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; fullwidth=&#8221;on&#8221; _builder_version=&#8221;4.2.2&#8243;][et_pb_fullwidth_header title=&#8221;How the European Rail Traffic Management System works (and why it&#8217;s not working)&#8221; _builder_version=&#8221;4.2.2&#8243; vertical_offset_tablet=&#8221;0&#8243; horizontal_offset_tablet=&#8221;0&#8243; hover_enabled=&#8221;0&#8243; z_index_tablet=&#8221;0&#8243; title_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; title_text_shadow_vertical_length_tablet=&#8221;0px&#8221; title_text_shadow_blur_strength_tablet=&#8221;1px&#8221; content_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; content_text_shadow_vertical_length_tablet=&#8221;0px&#8221; content_text_shadow_blur_strength_tablet=&#8221;1px&#8221; subhead_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; subhead_text_shadow_vertical_length_tablet=&#8221;0px&#8221; subhead_text_shadow_blur_strength_tablet=&#8221;1px&#8221; content_link_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; content_link_text_shadow_vertical_length_tablet=&#8221;0px&#8221; content_link_text_shadow_blur_strength_tablet=&#8221;1px&#8221; content_ul_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; content_ul_text_shadow_vertical_length_tablet=&#8221;0px&#8221; content_ul_text_shadow_blur_strength_tablet=&#8221;1px&#8221; content_ol_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; content_ol_text_shadow_vertical_length_tablet=&#8221;0px&#8221; content_ol_text_shadow_blur_strength_tablet=&#8221;1px&#8221; content_quote_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; content_quote_text_shadow_vertical_length_tablet=&#8221;0px&#8221; content_quote_text_shadow_blur_strength_tablet=&#8221;1px&#8221; button_one_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; button_one_text_shadow_vertical_length_tablet=&#8221;0px&#8221; button_one_text_shadow_blur_strength_tablet=&#8221;1px&#8221; button_two_text_shadow_horizontal_length_tablet=&#8221;0px&#8221; button_two_text_shadow_vertical_length_tablet=&#8221;0px&#8221; button_two_text_shadow_blur_strength_tablet=&#8221;1px&#8221; box_shadow_horizontal_tablet=&#8221;0px&#8221; box_shadow_vertical_tablet=&#8221;0px&#8221; box_shadow_blur_tablet=&#8221;40px&#8221; box_shadow_spread_tablet=&#8221;0px&#8221; box_shadow_horizontal_image_tablet=&#8221;0px&#8221; box_shadow_vertical_image_tablet=&#8221;0px&#8221; box_shadow_blur_image_tablet=&#8221;40px&#8221; box_shadow_spread_image_tablet=&#8221;0px&#8221; box_shadow_horizontal_button_one_tablet=&#8221;0px&#8221; box_shadow_vertical_button_one_tablet=&#8221;0px&#8221; box_shadow_blur_button_one_tablet=&#8221;40px&#8221; box_shadow_spread_button_one_tablet=&#8221;0px&#8221; box_shadow_horizontal_button_two_tablet=&#8221;0px&#8221; box_shadow_vertical_button_two_tablet=&#8221;0px&#8221; box_shadow_blur_button_two_tablet=&#8221;40px&#8221; box_shadow_spread_button_two_tablet=&#8221;0px&#8221; text_shadow_horizontal_length_tablet=&#8221;0px&#8221; text_shadow_vertical_length_tablet=&#8221;0px&#8221; text_shadow_blur_strength_tablet=&#8221;1px&#8221;]<\/p>\n<p><em>In order to increase security, capacity and competitiveness of European railways, the European Commission is encouraging the adoption of a common railway signage system throughout the entire EU, which is called ERTMS. Its implementation is much more expensive and slow than anticipated however.<\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<p><em>Author: Nikos Morfonios<\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<p><em>6\/2\/2020<\/em><\/p>\n<p>[\/et_pb_fullwidth_header][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.2.2&#8243; use_background_color_gradient=&#8221;on&#8221; background_color_gradient_start=&#8221;#F7F9FC&#8221; background_color_gradient_end=&#8221;#ffffff&#8221; custom_padding=&#8221;2px|||||&#8221; bottom_divider_style=&#8221;mountains2&#8243; bottom_divider_color=&#8221;#e5e3e0&#8243; bottom_divider_height=&#8221;356px&#8221;][et_pb_row _builder_version=&#8221;4.2.2&#8243; width=&#8221;60%&#8221; width_tablet=&#8221;80%&#8221; width_phone=&#8221;&#8221; width_last_edited=&#8221;on|tablet&#8221; custom_margin=&#8221;60px|auto||auto|false|false&#8221; custom_padding=&#8221;0px||||false|false&#8221; locked=&#8221;off&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243; width_tablet=&#8221;100%&#8221; width_phone=&#8221;&#8221; width_last_edited=&#8221;on|phone&#8221; module_alignment=&#8221;center&#8221;]<\/p>\n<p>The<span>\u00a0<\/span><a target=\"_blank\" href=\"http:\/\/www.ertms.net\/\" title=\"Link a European Rail Traffic Management System\" rel=\"noopener noreferrer\">European Rail Traffic Management System<span>\u00a0<\/span><i class=\"fa fa-external-link\"><\/i><span>\u00a0<\/span><\/a>(ERTMS) is a modern control-command system for signage and communication, which has been under constant development since the beginning of the 1990s by the European railway industry, with the support of the European Commission. The aim is to replace the 20 different signage systems that exist in Europe with one common system which will allow trains to move effortlessly from country to country. Dysfunctional national railway networks are given support in order to enhance their security, capacity and competitiveness. This system has been jointly developed by 8 companies: Alstom Transport, AZD Praha, Bombardier Transportation, CAF, Hitachi Rail STS, Mermec, Siemens Mobility, and Thales.<\/p>\n<p>The ERTMS has two parts, the European Train Control System (ETCS) and the Global System for Mobile Communications-Railway (GSM-R). ETCS is the main pillar of the overall traffic management system, which is why people often mix the two.<\/p>\n<p>[\/et_pb_text][et_pb_toggle title=&#8221;Read More&#8221; _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<p>The ETCS works on two sub-systems, consisting of the equipment placed on rail tracks, such as a radio transmitter (Eurobalise) which saves relevant data, such as speed limits, position reports and slopes; and the equipment which is placed on the train, such as antennas and special components in the engine.<\/p>\n<div class=\"embed \">\n<div class=\"content-view-embed\">\n<div class=\"class-image\">\n<div class=\"attribute-image\"><img decoding=\"async\" src=\"https:\/\/www.europeandatajournalism.eu\/var\/ezdemo_site\/storage\/images\/media\/images\/etcs-equipment-on-track\/154271-1-eng-GB\/etcs-equipment-on-track.png\" class=\"img-responsive\" alt=\"\" title=\"\" \/><\/div>\n<div class=\"attribute-caption\">\n<p>ETCS equipment on track (source: European Court of Auditors)<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"embed \">\n<div class=\"content-view-embed\">\n<div class=\"class-image\">\n<div class=\"attribute-image\"><img decoding=\"async\" src=\"https:\/\/www.europeandatajournalism.eu\/var\/ezdemo_site\/storage\/images\/media\/images\/etcs-equipment-on-board\/154276-1-eng-GB\/etcs-equipment-on-board.png\" class=\"img-responsive\" alt=\"\" title=\"\" \/><\/div>\n<div class=\"attribute-caption\">\n<p>ETCS equipment on board (source: European Court of Auditors)<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>The different devices on tracks and trains constantly exchange information, enabling a continuous monitoring of the maximum permissible operating speed, and providing the driver with all the information required to control the vehicle. For example, as Greek driver Kostas Genidounias explains, if a train is moving at excessive speed, \u201cthe ETCS triggers a sound alert in the driver\u2019s cab. If the driver doesn\u2019t slow down, the train will come to an abrupt stop\u201d. Dashboard indicators alert the driver to reduce speed when a traffic light is red or when the train is getting close to a side-pass, and take note of specific points where radio frequencies are attached to the traffic lights.<\/p>\n<p>Depending on how information is transmitted within a train, two levels of control have been developed: Level 1, where the train communicates with the tracks through radio frequencies (beacons), as described above, and Level 2, where communication is established through the mobile communications system GSM-R frequencies, which are also used for mobile telephone networks but specifically modulated here for railways. What is worth noting is that over the years various versions of ETCS have been developed. As we\u2019ll see below, since the system is being constantly developed in order to adapt to technological advances, compatibility problems inevitably arise between track and vehicle equipment.\u00a0<\/p>\n<p>[\/et_pb_toggle][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.2.2&#8243; background_color=&#8221;#e5e3e0&#8243; custom_padding=&#8221;1px|||||&#8221;][et_pb_row _builder_version=&#8221;4.2.2&#8243; custom_margin=&#8221;-3px|auto|-40px|auto|false|false&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<h2 style=\"text-align: center;\">Index<\/h2>\n<p style=\"text-align: center;\">\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=&#8221;1_2,1_2&#8243; _builder_version=&#8221;4.1&#8243; custom_padding=&#8221;||100px|||&#8221;][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.1&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<p><a href=\"#1\">&#8211; Huge delays in the implementation of ERTMS <\/a><a href=\"#3\"><\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.1&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<p><a href=\"#2\">&#8211; Why ERTMS is being implemented too little, too slow<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; module_id=&#8221;1&#8243; _builder_version=&#8221;4.2.2&#8243; background_color=&#8221;#ffffff&#8221; custom_padding=&#8221;120px||50px||false|&#8221;][et_pb_row _builder_version=&#8221;4.2.2&#8243; custom_margin=&#8221;30px|auto|-40px|auto|false|false&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<h2 style=\"text-align: center;\">Huge delays in the implementation of ERTMS\u00a0<\/h2>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.2.2&#8243; width=&#8221;60%&#8221; width_tablet=&#8221;80%&#8221; width_phone=&#8221;&#8221; width_last_edited=&#8221;on|tablet&#8221; custom_padding=&#8221;0px||||false|false&#8221; locked=&#8221;off&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<p><span>Despite its usefulness, ERTMS is still miles from being considered a \u201csuccess story\u201d for the European Commission. The Commission has been designing policies and providing considerable financial support in order to establish ERTMS as the single European system for railway traffic management. According to a\u00a0<\/span><a target=\"_blank\" href=\"https:\/\/op.europa.eu\/webpub\/eca\/special-reports\/ertms-rail-13-2017\/en\/\" title=\"Link a Special Report\" rel=\"noopener noreferrer\"><span>Special Report<\/span><span>\u00a0<\/span><i class=\"fa fa-external-link\"><\/i><span>\u00a0<\/span><\/a><span>of the European Court of Auditors of 2017, between 2007 and 2020 about \u20ac4 billion where allocated to member states for the development of ERTMS.<\/span>\u03c5.<\/p>\n<p>[\/et_pb_text][et_pb_toggle title=&#8221;Read More&#8221; _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<h4><strong>EU financial support to ERTMS in 2007-2020 (in millions of euro)<\/strong><\/h4>\n<table class=\"table table-striped\">\n<tbody>\n<tr>\n<td valign=\"top\">Source of funding<\/td>\n<td valign=\"top\">2007-2013<\/td>\n<td valign=\"top\">2014-2020<\/td>\n<td valign=\"top\">Co-financing rate<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">TEN-T\/CEF<\/td>\n<td valign=\"top\">645<\/td>\n<td valign=\"top\">850<\/td>\n<td valign=\"top\">Up to 50\u00a0%<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ERDF\/Cohesion Fund\/ESIF<\/td>\n<td valign=\"top\">570<\/td>\n<td valign=\"top\">1\u00a0900<\/td>\n<td valign=\"top\">Up to 85\u00a0%<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Total<\/td>\n<td valign=\"top\">1\u00a0215<\/td>\n<td valign=\"top\">2\u00a0750<\/td>\n<td valign=\"top\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a id=\"eztoc154249_0_1_1_1\"><\/a><\/p>\n<h5><em>Source:\u00a0European Court of Auditors based on data from the European Commission.<\/em><\/h5>\n<p>The Special Report is no less revealing when it comes to the system\u2019s derailment. A special control group by the European Court of Auditors conducted extensive research for a year and a half of, traveling to six countries and covering different parts of the EU&#8217;s nine core railway network corridors. The European Court of Auditors noted that the development of ERTMS across the EU is still very low and fragmented, even if in principle the railway industry is on board with the overall idea of implementing it.\u00a0<\/p>\n<div class=\"embed \">\n<div class=\"content-view-embed\">\n<div class=\"class-image\">\n<div class=\"attribute-image\"><img decoding=\"async\" src=\"https:\/\/www.europeandatajournalism.eu\/var\/ezdemo_site\/storage\/images\/media\/images\/ten-t_core_network_corridors_-freight_and_passenger\/154291-1-eng-GB\/TEN-T_core_network_corridors_-freight_and_passenger.png\" class=\"img-responsive\" alt=\"\" title=\"\" \/><\/div>\n<div class=\"attribute-caption\">\n<p>The Core Network Corridors (source: European Commission)<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>The first technical specifications for ERTMS interoperability, which are obligatory for high speed trains and the conventional railway system, became legally binding in 2002. The first official deadlines for ERTMS implementation were established by the European Commission with the 2009 European Deployment Plan, setting landmarks for 2015 and 2020. The<span>\u00a0<\/span><a target=\"_blank\" href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/HTML\/?uri=CELEX:32012D0088&amp;from=EL\" title=\"Link a 2012\/88\u00a0 decision\" rel=\"noopener noreferrer\">2012\/88\u00a0 decision<span>\u00a0<\/span><i class=\"fa fa-external-link\"><\/i><span>\u00a0<\/span><\/a>by the Commission made it obligatory to install ERTMS in all railway projects funded by the EU.<\/p>\n<p>Despite this, only about 8 per cent of the<strong>\u00a0<\/strong>core network corridors were equipped with ERTMS in 2016. The Commission\u2019s plan had thus been derailed. The Commission reviewed these goals with the new<span>\u00a0<\/span><a target=\"_blank\" href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EL\/TXT\/PDF\/?uri=CELEX:32017R0006&amp;from=EN\" title=\"Link a ERTMS European Deployment Plan\" rel=\"noopener noreferrer\"><span>ERTMS European Deployment Plan<\/span><span>\u00a0<\/span><i class=\"fa fa-external-link\"><\/i><span>\u00a0<\/span><\/a>of 2017, which moved the deadline for the core network corridors from 2015 to 2030. At that time the plan will be re-evaluated and specific coordinated deadlines will be set.<\/p>\n<div class=\"embed \">\n<div class=\"content-view-embed\">\n<div class=\"class-image\">\n<div class=\"attribute-image\"><img decoding=\"async\" src=\"https:\/\/www.europeandatajournalism.eu\/var\/ezdemo_site\/storage\/images\/media\/images\/ertms-2016\/154296-1-eng-GB\/ERTMS-2016.jpg\" class=\"img-responsive\" alt=\"\" title=\"\" \/><\/div>\n<div class=\"attribute-caption\">\n<p>ERTMS deployment in core network corridors, as of the end of 2016 (in km) (source: European Court of Auditors based on data of the European Commission)<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>According to the<span>\u00a0<\/span><a target=\"_blank\" href=\"https:\/\/www.era.europa.eu\/sites\/default\/files\/library\/docs\/safety_interoperability_progress_reports\/railway_safety_and_interoperability_in_eu_2018_en.pdf\" title=\"Link a 2018 Report on Rail Safety and Interoperability\" rel=\"noopener noreferrer\"><span>2018 Report on Rail Safety and Interoperability<\/span><span>\u00a0<\/span><i class=\"fa fa-external-link\"><\/i><span>\u00a0<\/span><\/a>by the EU Agency for Railways, the application rate of ETSC on the core network corridors continued to be low in May 2018, reaching just 9 per cent, in contrast to GSM-R, which reached 57 per cent. Based on these numbers, the report highlights how the aim to cover 31 per cent of the core network corridors with ERTMS by 2023 \u2013 a goal set by the latest ERTMS Deployment Plan \u2013 is at risk.\u00a0<\/p>\n<p>[\/et_pb_toggle][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; module_id=&#8221;2&#8243; _builder_version=&#8221;4.2.2&#8243; background_color=&#8221;#ffffff&#8221; custom_padding=&#8221;120px||50px||false|&#8221;][et_pb_row _builder_version=&#8221;4.2.2&#8243; custom_margin=&#8221;30px|auto|-40px|auto|false|false&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<h2 style=\"text-align: center;\">Why ERTMS is being implemented too little, too slow<\/h2>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.2.2&#8243; width=&#8221;60%&#8221; width_tablet=&#8221;80%&#8221; width_phone=&#8221;&#8221; width_last_edited=&#8221;on|tablet&#8221; custom_padding=&#8221;0px||||false|false&#8221; locked=&#8221;off&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<p><span>According to the European Court of Auditors&#8217; Special Report, the main reason why ERTMS has not been implemented so far is unwillingness on the part of many infrastructure managers and railway companies to invest in ERTMS equipment, due to both cost and feasibility. For instance, incentives are low in member states such as Germany, where the national rail system is already functioning well.\u00a0<\/span><\/p>\n<p>[\/et_pb_text][et_pb_toggle title=&#8221;Read More&#8221; _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<p>As the Special Report highlights, the Commission did not estimate the overall cost of the introduction of the new system when defining the funding for it. In order for ERTMS to be fully operational, the overall cost that infrastructure managers have to deal with is not just the cost of equipment and installation, but also other costs linked to the transition phase. In the same report, the Commission admits that \u201cthe costs occasionally noted in relation to the ERTMS include associated costs (up to 2\/3) beyond those directly related to ERTMS, for example electricity, railway equipment and track key systems. The investments reflect the overall upgrading of the signage infrastructure, including past maintenance work that goes beyond the ERTMS investment. Such work may also be required in the case of replacement of obsolete signage systems beside the ERTMS or to handle ongoing maintenance work.&#8221;<\/p>\n<p>The European Court of Auditors calculated that the actual implementation cost of ERTMS, for both track and vehicle installations, could potentially reach \u20ac80 billion for the core network corridors. Regarding such a high cost, the European Commission provided only a vague response: \u201cthe overall cost can be reduced over time due to technological advancement, economy scales and increased competition among ERTMS providers.&#8221;<\/p>\n<p>ERTMS is integrated in the EU&#8217;s national railway networks, including their signage systems. However, member states have chosen to develop ERTMS at different stages, or with solutions tailored to their national networks, while technical specifications for interoperability have evolved at an extremely rapid pace. This has hampered the overall system&#8217;s stability, requiring subsequent upgrades to subsystems to ensure compatibility.<\/p>\n<p>[\/et_pb_toggle][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; module_id=&#8221;12&#8243; _builder_version=&#8221;4.2.2&#8243; background_color=&#8221;#e5e3e0&#8243; custom_padding=&#8221;51px||130px||false|false&#8221;][et_pb_row _builder_version=&#8221;4.2.2&#8243; custom_margin=&#8221;30px|auto|-40px|auto|false|false&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<h2 style=\"text-align: center;\">Author<\/h2>\n<figure class=\"gallery-item\"><\/figure>\n<p style=\"text-align: center;\">\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.1&#8243; custom_padding=&#8221;||0px|||&#8221; hover_enabled=&#8221;0&#8243;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.1&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243; hover_enabled=&#8221;0&#8243;]<\/p>\n<p style=\"text-align: center;\">Author: Nikos Morfonios<\/p>\n<p style=\"text-align: center;\"><span>This article was published in<\/span><a href=\"https:\/\/www.europeandatajournalism.eu\/eng\/News\/Data-news\/How-the-European-Rail-Traffic-Management-System-works-and-why-it-s-not-working\" target=\"_blank\" rel=\"noopener noreferrer\"><span> the <\/span>European Data Journalism Network \u2013 EDJNet<span>.<\/span>\u00a0<\/a><\/p>\n<p style=\"text-align: center;\">Copyright: MIIR\u00a0<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;Call To Action&#8221; _builder_version=&#8221;4.2.2&#8243; use_background_color_gradient=&#8221;on&#8221; background_color_gradient_start=&#8221;rgba(40,61,75,0.56)&#8221; background_color_gradient_end=&#8221;rgba(255,61,83,0.13)&#8221; background_color_gradient_direction=&#8221;70deg&#8221; background_color_gradient_overlays_image=&#8221;on&#8221; background_image=&#8221;https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/76.jpg&#8221; background_enable_video_mp4=&#8221;off&#8221; custom_margin=&#8221;|||&#8221; custom_padding=&#8221;16vw||8vw||false|false&#8221; top_divider_style=&#8221;mountains2&#8243; top_divider_color=&#8221;#e5e3e0&#8243; top_divider_height=&#8221;18vw&#8221; top_divider_repeat=&#8221;0.5x&#8221; bottom_divider_height=&#8221;14%&#8221; bottom_divider_repeat=&#8221;0.5x&#8221; bottom_divider_flip=&#8221;horizontal&#8221; global_module=&#8221;9012&#8243; saved_tabs=&#8221;all&#8221; locked=&#8221;off&#8221;][et_pb_row custom_padding_last_edited=&#8221;on|phone&#8221; _builder_version=&#8221;4.2.2&#8243; custom_margin=&#8221;|||&#8221; custom_padding=&#8221;27px|0px|0|0px|false|false&#8221; custom_padding_tablet=&#8221;36px||12px||false|false&#8221; custom_padding_phone=&#8221;80px||60px||false|false&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.2&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.2.2&#8243; header_font_size=&#8221;37px&#8221; text_orientation=&#8221;center&#8221; background_layout=&#8221;dark&#8221; custom_margin=&#8221;||21px|||&#8221;]<\/p>\n<h1>Support Us<\/h1>\n<p>\u2014<\/p>\n<p><span>For Independent investigative journalism, material resources and time are much needed. <\/span><br \/> <span>We do not accept ads, so help us continue our work.<\/span><\/p>\n<p><span>IBAN: GR08 0140 1040 1040 0200 2028 234 (Alpha Bank)<\/span><\/p>\n<p>[\/et_pb_text][et_pb_button button_url=&#8221;https:\/\/www.paypal.com\/signin?forceLogin=false&#038;returnUri=https%3A%2F%2Fwww.paypal.com%2Fdonate&#038;state=%252F%253Ftoken%253DN9zqblSOy_EUHJbFR3Ojr4DFFGnRuNr6pf6WDwaEvw9TTtkZIl7G7yhSb8IRxyYtCWOoc0%2526fromUL%253Dtrue&#038;intent=donate&#038;ctxId=78cff814a59a41dba97b577ac32bd553&#8243; button_text=&#8221;Make a donation&#8221; button_alignment=&#8221;center&#8221; _builder_version=&#8221;4.2.2&#8243; custom_button=&#8221;on&#8221; button_text_size=&#8221;20px&#8221; button_text_color=&#8221;#ffffff&#8221; button_bg_color=&#8221;#FF3D53&#8243; button_border_color=&#8221;rgba(0,0,0,0)&#8221; button_border_radius=&#8221;-2px&#8221;][\/et_pb_button][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to increase security, capacity and competitiveness of European railways, the European Commission is encouraging the adoption of a common railway signage system throughout the entire EU, which is called ERTMS. Its implementation is much more expensive and slow than anticipated however. \u00a0 Author: Nikos Morfonios \u00a0 6\/2\/2020 The\u00a0European Rail Traffic Management System\u00a0\u00a0(ERTMS) is [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":8936,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[72],"tags":[433,434,435,436,437,438,439,205,126,88,90,52],"class_list":["post-8894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investigations","tag-train","tag-railway","tag-greek-railway","tag-tempe","tag-signal","tag-infrastructure","tag-hellenic-train","tag-edjnet-3","tag-greece","tag-accidents","tag-european-union","tag-miir"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How the European Rail Traffic Management System works (and why it&#039;s not working) - MIIR<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How the European Rail Traffic Management System works (and why it&#039;s not working) - MIIR\" \/>\n<meta property=\"og:description\" content=\"In order to increase security, capacity and competitiveness of European railways, the European Commission is encouraging the adoption of a common railway signage system throughout the entire EU, which is called ERTMS. Its implementation is much more expensive and slow than anticipated however. \u00a0 Author: Nikos Morfonios \u00a0 6\/2\/2020 The\u00a0European Rail Traffic Management System\u00a0\u00a0(ERTMS) is [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/\" \/>\n<meta property=\"og:site_name\" content=\"MIIR\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-05T07:43:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-20T14:23:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1620\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"aris athanatos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"aris athanatos\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/\",\"url\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/\",\"name\":\"How the European Rail Traffic Management System works (and why it's not working) - MIIR\",\"isPartOf\":{\"@id\":\"https:\/\/miir.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg\",\"datePublished\":\"2020-02-05T07:43:40+00:00\",\"dateModified\":\"2024-03-20T14:23:48+00:00\",\"author\":{\"@id\":\"https:\/\/miir.gr\/#\/schema\/person\/dac2a7f434bc89cfbad580e5df3c00c8\"},\"breadcrumb\":{\"@id\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#primaryimage\",\"url\":\"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg\",\"contentUrl\":\"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg\",\"width\":1620,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/miir.gr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How the European Rail Traffic Management System works (and why it&#8217;s not working)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/miir.gr\/#website\",\"url\":\"https:\/\/miir.gr\/\",\"name\":\"MIIR\",\"description\":\"Mediterranean Institute for Investigative Reporting\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/miir.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/miir.gr\/#\/schema\/person\/dac2a7f434bc89cfbad580e5df3c00c8\",\"name\":\"aris athanatos\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/miir.gr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0df5f48e463fd3cd3aafecf98e6dab125a95269827255c8cf9fb6d3ae288aec1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0df5f48e463fd3cd3aafecf98e6dab125a95269827255c8cf9fb6d3ae288aec1?s=96&d=mm&r=g\",\"caption\":\"aris athanatos\"},\"url\":\"https:\/\/miir.gr\/en\/author\/aris\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How the European Rail Traffic Management System works (and why it's not working) - MIIR","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/","og_locale":"en_US","og_type":"article","og_title":"How the European Rail Traffic Management System works (and why it's not working) - MIIR","og_description":"In order to increase security, capacity and competitiveness of European railways, the European Commission is encouraging the adoption of a common railway signage system throughout the entire EU, which is called ERTMS. Its implementation is much more expensive and slow than anticipated however. \u00a0 Author: Nikos Morfonios \u00a0 6\/2\/2020 The\u00a0European Rail Traffic Management System\u00a0\u00a0(ERTMS) is [&hellip;]","og_url":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/","og_site_name":"MIIR","article_published_time":"2020-02-05T07:43:40+00:00","article_modified_time":"2024-03-20T14:23:48+00:00","og_image":[{"width":1620,"height":1080,"url":"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg","type":"image\/jpeg"}],"author":"aris athanatos","twitter_card":"summary_large_image","twitter_misc":{"Written by":"aris athanatos","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/","url":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/","name":"How the European Rail Traffic Management System works (and why it's not working) - MIIR","isPartOf":{"@id":"https:\/\/miir.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#primaryimage"},"image":{"@id":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#primaryimage"},"thumbnailUrl":"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg","datePublished":"2020-02-05T07:43:40+00:00","dateModified":"2024-03-20T14:23:48+00:00","author":{"@id":"https:\/\/miir.gr\/#\/schema\/person\/dac2a7f434bc89cfbad580e5df3c00c8"},"breadcrumb":{"@id":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#primaryimage","url":"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg","contentUrl":"https:\/\/miir.gr\/wp-content\/uploads\/2020\/02\/wolfgang-rottmann-kGEiSgwHWgE-unsplash.jpg","width":1620,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/miir.gr\/pos-leitoyrgei-to-eyropaiko-systima-diacheirisis-tis-sidirodromikis-kykloforias-kai-giati-den-leitoyrgei\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/miir.gr\/en\/"},{"@type":"ListItem","position":2,"name":"How the European Rail Traffic Management System works (and why it&#8217;s not working)"}]},{"@type":"WebSite","@id":"https:\/\/miir.gr\/#website","url":"https:\/\/miir.gr\/","name":"MIIR","description":"Mediterranean Institute for Investigative Reporting","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/miir.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/miir.gr\/#\/schema\/person\/dac2a7f434bc89cfbad580e5df3c00c8","name":"aris athanatos","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/miir.gr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0df5f48e463fd3cd3aafecf98e6dab125a95269827255c8cf9fb6d3ae288aec1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0df5f48e463fd3cd3aafecf98e6dab125a95269827255c8cf9fb6d3ae288aec1?s=96&d=mm&r=g","caption":"aris athanatos"},"url":"https:\/\/miir.gr\/en\/author\/aris\/"}]}},"_links":{"self":[{"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/posts\/8894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/comments?post=8894"}],"version-history":[{"count":19,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/posts\/8894\/revisions"}],"predecessor-version":[{"id":9224,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/posts\/8894\/revisions\/9224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/media\/8936"}],"wp:attachment":[{"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/media?parent=8894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/categories?post=8894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/miir.gr\/en\/wp-json\/wp\/v2\/tags?post=8894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}